St Catherine's College, Phase 3


Details of Project

  • Client: St Catherine's College, Phase 3
  • Used Tools: Alspec Commercial Glazing Suites, Wintec Architectural Louvre Systems, Alspec Commercial Fixed Louvre Suite
  • Link to Project: Visit Site

Things we completed

  • Louvre windows for airflow through all classrooms
  • Rain proof louvres in gym area
  • Stacking sliding glass doors

We were very pleased to be offered the latest phase of this project by Hutchinson Builders.

This project had some unique challenges including electrically operated glass louvre windows to allow ample high level ventilation to classrooms & work areas with the convenience of push button operation.

We also were required to allow for sound proofing/reduction to music practice rooms to allow for multiple classes to be ran simultaneously down to the huge 10 meter wide multi stacking sliding door that opens onto the undercover performance/sports area.

To allow for wind/weather proofing to outdoor undercover areas we installed large commercial fixed louvre panels that would reduce wind and rain blowing through giving true all weather usage.

Our suppliers
supplier logos
Industry associations
Industry associations
Website developed by Kapow Interactive